29 Nov
2015
29 Nov
'15
8:29 p.m.
Me, Jeff B., Tony (plus his son Mike), and Steve A. got a lot done at the museum today. In the new museum room: - Removed all leftover Infoage stuff - Swept the floor, brought in trash cans - Tony brought a bunch of tables and chairs for Festivus + we set them up - Moved a refrigerator into the room - Brought in the non-perishable food - Located the correct thermostat In the warehouse: - Assembled and filled two shelving units - Put away various unsorted items - Made a plan for sorting the rest of it - Brought in various stuff from museum Jeff B. will stop by on Friday to plug in the fridge and load it with soft drinks + perishable food (no point in plugging it in today and leaving it on all week).