I know this is the same date as Festivus, however trying to squeeze in one more work day in 2025 to catch up on the stray ends at Camp Evans. Plan is Saturday, 12/13/2025, Would start at 10:00 AM with a hard stop at 2:00 Plan of the Day: * Assemble a new network backboard for 9032B / 9032C, and install in the furnace room of 9032C. On that, could someone grab one of the 2 foot x 4 foot backboards in the studio and paint it black as prep work? * Install the additional memory and new CPU in the firewall servers. * Assemble the PDU to UPS power cables in 9059 * Install the cables for the new cameras to cover second street in the RTM Time permitting: * Drill the Building 9003 basement floor to bolt down the network rack using the Hilti chemical anchors. Reply off-list if you have availability Martin