Martin is doing some network cable routing for Infoage this Saturday. I'll be in the museum that day; anyone interested in spending the day climbing in attics and such? If so, then email Martin directly: maflynn@theflynn.org .... the more our members help with IA projects, the better it reflects on us as a group. On 3/29/2017 6:34 PM, Martin A Flynn wrote:
On Saturday, April 8th, We will be working on the main post to square away several minor projects and would like to invite you to lend a hand!
The POD (Plan Of the Day) is to arrive around 10:00 AM and attempt to tackle the following items
Running a network cable to the access point in the 9059 Classroom Will require being in the 9059 attic 1 Installing a VGA cable for the projector in the 9059 Classroom Portion of the job will require being in the 9059 attic 2 Set up the power cable for the projector in the 9059 Classroom Can be done from the 9059 classroom 3 Run the last two network cable sets in the IXR lab (empty wall boxes between the IXR front door and the interior door of the CDL) Portion of the job will require being in the 9059 attic, portion in the 9059 furnace room 4 Network cables for the CEBOT ticket booth outside 9059 Will require being in the 9059 attic 5 Fiber optic cable between 9059 and the furnace room of 9032D Will require being in the 9059 attic, the 9032D attic, and on ladders in the street. 6 Install IP cameras in the IXR lab Portion of the job will require being in the 9059 attic, portion can be done from the IXR lab. 7 Mounting wall network equipment rack for IP Cameras and Access points 9032D furnace room, will require working on a stepladder 8 Installing IP camera brackets in the RTM (attached to the ceiling grid) 9032D exhibit space, , will require working on a stepladder 9 Configuration of CISCO core in 6059 Can be done from the IXR lab. 10
Let me know if you available, and what items you are interested in helping with. Feel free to pass along to your membership.
Martin Flynn