Not sure what your equipment is like, but I've got a Hilti SDS rotary hammer if you guys have only a standard hammer drill. That concrete is going to be old and very tough! Thanks, Jonathan ‐‐‐‐‐‐‐ Original Message ‐‐‐‐‐‐‐ On Sunday, July 25th, 2021 at 16:09, Jeffrey Brace via vcf-midatlantic <vcf-midatlantic@lists.vcfed.org> wrote:
Martin will be at InfoAge on July 31 from 9AM to 5PM and needs help with
the following:
- Set the cable anchors in the hotel basement for the fiber optic cables
(about a dozen 1/4" holes in the concrete beam between the front wall of
the hotel and the column by the rack) - Open up the holes for the equipment rack in the hotel basement floor.
(four 1/2" holes with a hammer drill) - Mount the network equipment rack in the furnace room at the read of
9032A. - Assemble and rack the second UPS in 9059, and move red power cables to
it. - Drill the hole from the media recover office on the second floor of
the hotel into the attic. (one 1/2" hole with a hammer drill) - Cut the blocking for the underside of the engineers desk in 9059 with
the little table saw.
Anyone willing to help anywhere in that time frame?
=========================================
Jeff Brace
Vice President & Board Member
Vintage Computer Festival East Show-runner
Vintage Computer Federation is a 501c3 charity
jeffrey@vcfed.org