You are tearing it up- Thanks! -DC On 8/7/2022 12:04 PM, Martin Flynn via vcf-midatlantic wrote:
The usual suspects addressed several projects at Camp Evans to move the various VCF projects along
* The 100 pair aerial cable to support providing analog dial-tone to the VCF museum was confirmed to be dry and ready to attach to the messenger wire. * The new fiber between the makerspace and guard shack is routed through the cable entry vault to the fiber MDF. This allows a 10GB feed, should VCF want to use the guard shack as the entry point for VCE East. * The IP security cameras are programmed and on the bench in the makerspace (location and installation in the new museum space to be coordinated. * The upstream WAN switch to support the firewall cluster was installed, image at http://compdecon.org/wp-content/uploads/2022/08/fw_switch_swap.png
Martin Flynn