OT / Save the Date - Hack the Base and Makerspace...
There's a bunch of small projects that need attention, let me know if you are available on 09/07/2024 to lend a hand. Work day is expected to run from 10:00 AM to 2:00 PM, pizza is planned for lunch Here's the plan of the day: * Mount the new digital clock over the classroom door, needs a network cable routed through the attic http://compdecon.org/wp-content/uploads/2024/08/new_digital_clock.jpg * Run the power cables for the new pair of UPS * Mount the television antenna on the gable end of the building. * Install the GPS antenna and run the heliax feed line to the entry panel on the back of the building * Install the missing lenses on the light fixtures in the Makerspace in Building 9059. * Drive the ground rod for the overhead phone cable to building 9032D (RTM/ARC), and install the protector module. The InfoAge calendar shows the day as un-booked / open, we would need to be wrapped up and off site by 5:00 PM at the latest for the paranormal research (AKA Ghost Hunt) that evening.
On 8/11/24 21:43, M Flynn wrote:
There's a bunch of small projects that need attention, let me know if you are available on 09/07/2024 to lend a hand.
Work day is expected to run from 10:00 AM to 2:00 PM, pizza is planned for lunch
Which suggests I need to clean up in the lab (quite a bit). I'll get started on that.
Here's the plan of the day:
* Mount the new digital clock over the classroom door, needs a network cable routed through the attic http://compdecon.org/wp-content/uploads/2024/08/new_digital_clock.jpg
GAH, attic! Good news is I think we already have a hole there for something else. I don't think it's high voltage (120v) so if there's room we can share the existing hole. We're stolen your long black cable (our PC got locked out of one of the switch ports, so we swapped cables). We need to get another. I'll order up something so we can return your black cable.
* Run the power cables for the new pair of UPS * Mount the television antenna on the gable end of the building. * Install the GPS antenna and run the heliax feed line to the entry panel on the back of the building
* Install the missing lenses on the light fixtures in the Makerspace in Building 9059.
Looks like I have some work to complete with the lights (make sure all are on the new LED bulbs). Do we have new lenses? The lenses I have don't quite fit right but they will work.
* Drive the ground rod for the overhead phone cable to building 9032D (RTM/ARC), and install the protector module.
The InfoAge calendar shows the day as un-booked / open, we would need to be wrapped up and off site by 5:00 PM at the latest for the paranormal research (AKA Ghost Hunt) that evening.
I'll plan to be there. I'll need to bring Mom. -- Linux Home Automation Neil Cherry kd2zrq@linuxha.com http://www.linuxha.com/ Main site http://linuxha.blogspot.com/ My HA Blog Author of: Linux Smart Homes For Dummies KD2ZRQ
participants (2)
-
Martin A. Flynn -
Neil Cherry