OT / Extra hands needed for site work
17 Sep
2021
17 Sep
'21
7:35 a.m.
CDL and VCF will have a team on site tackling project and site work on 09/25/2021. If you are available, and wish to assist, please email me directly as to keep the clutter off the list. Work includes: * Assembling and placing the network rack in building 9032A (adjacent to the big room used for VCF East) * Installing the balance of the hangers for the fiber to 9032A * Testing the network drop in the bunk room for VCF * Installing a network cables for 9010B (access points for VCF East) * Assembling and mounting the network rack in the hotel attic. * Installing a pair of network cables in 9010A for Garden State Martin Flynn