OT / Host site work supporting the TLM-18 Antenna
Was on site yesterday with Bill D working on the Diana site technology "bucket list". * The new network switch is up and running (previous unit was damaged by running the UPS with bad batteries, CDL and Dan Marlow funded replacement batteries. * All four network cameras the Diana site are working. Link to screen shot: http://compdecon.org/wp-content/uploads/2023/11/diana_site_cams.jpg * Bill D installed the EMP / Lightning protectors for the exterior cameras in the furnace room, final cut over is pending. * The computers supporting the touch-screens were replaced with new units running W11, and mounted in the correct bracket on the back of the touchscreens. Link: http://compdecon.org/wp-content/uploads/2023/11/IMG_3840-scaled.jpg * The camera cables were cut (again) during landscaping activities by Wall Township. I was able to temporarily splice them, however they need to be re-run. InfoAge needs to purchase at least 100 meters of Belden/Mohawk M57622 outdoor network cable to effect permanent repair . Link to picture: http://compdecon.org/wp-content/uploads/2023/11/IMG_3876-scaled.jpg / http://compdecon.org/wp-content/uploads/2023/11/IMG_3877-scaled.jpg Wrap up (and hopefully close-out) is scheduled for Saturday, 12/02/2023 starting at 10:00 AM. Plan of the day is to wrap up the computer / camera / network tasks, along with installing the console brackets so the work surface can be fitted. If you are available and are interested in helping with the tech work, please contact me off-list. Martin Flynn
participants (1)
-
Martin A. Flynn