OT / InfoAge and VCF support
VCF and CDL joined forces Saturday to square away a large quantity of project work. * Ken G & Martin F racked the new UPS in 9059, found out the warranty replacement is is a higher wattage (3.0 kW vs 2.2 kW) than the unit it's replacing. Material to deploy two new 30A circuits is inbound, work being coordinated with the IA electrician, Bob P. * Ken installed the anchors under the eaves of 9059 for the fiber run to 9032A. Ran out of material and time to install the anchors on 9032. Additional anchors for 9032 has been ordered. * Ken, CJ, and his son Joe set up the rack mounting holes in hotel basement floor and added anchors for the fiber optic cables, The anchor bolts for the rack are set into the slab using a Hilti two-part system. I routed in the fiber that runs to the 9001 attic into the new rack. * Handed off the new Cisco two-line analog telephone adapter (ATA) for the VCF team to Jeff B. Jeff tested, is working fine. Both lines are available for VCF use, both have voice mail. * ATA for the BBS is active, Server is racked and powered, DNS in place. Last remaining is the firewall rule deployment. Since the VCF workshop is on the 14th, I was planning on being on site on the 7th to continue the work that is prep for VCF-E, rather than push this out closer to VCF-E. If you are available to assist, please reply off-list to reduce the clutter Martin Flynn
participants (1)
-
Martin Flynn