[vcf-midatlantic] OT / Update
Martin Flynn
maflynn at theflynn.org
Sun Aug 7 16:04:24 UTC 2022
The usual suspects addressed several projects at Camp Evans to move the
various VCF projects along
* The 100 pair aerial cable to support providing analog dial-tone to
the VCF museum was confirmed to be dry and ready to attach to the
messenger wire.
* The new fiber between the makerspace and guard shack is routed
through the cable entry vault to the fiber MDF. This allows a 10GB
feed, should VCF want to use the guard shack as the entry point for
VCE East.
* The IP security cameras are programmed and on the bench in the
makerspace (location and installation in the new museum space to be
coordinated.
* The upstream WAN switch to support the firewall cluster was
installed, image at
http://compdecon.org/wp-content/uploads/2022/08/fw_switch_swap.png
Martin Flynn
More information about the vcf-midatlantic