> The usual suspects addressed several projects at Camp Evans to move the
> various VCF projects along
>
> * The 100 pair aerial cable to support providing analog dial-tone to
> the VCF museum was confirmed to be dry and ready to attach to the
> messenger wire.
> * The new fiber between the makerspace and guard shack is routed
> through the cable entry vault to the fiber MDF. This allows a 10GB
> feed, should VCF want to use the guard shack as the entry point for
> VCE East.
> * The IP security cameras are programmed and on the bench in the
> makerspace (location and installation in the new museum space to be
> coordinated.
> * The upstream WAN switch to support the firewall cluster was
> installed, image at
> http://compdecon.org/wp-content/uploads/2022/08/fw_switch_swap.png
>
> Martin Flynn